Header Bond: Every single course is made up completely of headers (limited aspect going through the front). It’s typically used in walls which are 1 brick in thickness. The Portland cement and drinking water combine and surround the sand and gravel. Concurrently, the water reacts chemically Along with the Portland https://digitalasset.sfo2.digitaloceanspaces.com/westhillmasonry/Hardscape-Contractors.html