The soil investigation report handed to your structural engineer for that design of pile foundation goal must comprise the embedment duration on the piles, the advised dimensions of the pile, the Protected working load of every pile sizing, along with other information That could be needed for the structural engineer https://directoryark.com/listings12922596/not-known-details-about-prefabricated-roof-trusses-installation