On account of the problems we had throughout the staining procedure, we haven’t performed our prime coat still (stay tuned) but i’m guessing That ought to acquire two to 3 days considering the fact that we’re utilizing a water-based merchandise. We ran into a huge situation in the edge sanding https://brotherfloors.com/